Civic dashboard (concept)
One entry point to understand the whole city
Projects, budgets, case handling and meeting records in one place — searchable, comparable and downloadable, with proposals, discussion, voting and follow-up.
Every screen on this page is a conceptual mock-up
This screen is a conceptual mock-up of the Hualien Civic Dashboard. It is not a live platform and contains no real-time data.
These seven screens are illustrations of what we intend to build after taking office. They are not a platform that exists or runs today. The information types, fields and map layers follow the policy proposals; the live version will label the source, update date and responsible unit for every dataset.
Seven modules
The seven modules, each explained: what the module publishes and what citizens can look up.
Module numbers show section order only. They are not a priority order or a measure of completion.
市民陳情
案件從收件到改善,都能追蹤
Concept screen
Case categories (relative share)
- Roads
- Drainage
- Street lights
- Traffic
Report hotspot map (de-identified)
The hotspot map never shows a reporter’s personal data — only the location where an issue recurs.
Case tracking
- Road casesIn progress
- Drainage casesIn progress
- Street light casesIn progress
- Traffic casesIn progress
Recurring-issue improvement list
- Repeated damage on the same road sectionOn the list
- Repeated flooding in the same areaOn the list
- Insufficient lighting on the same road sectionOn the list
數值說明:This mock-up shows layout structure only. Every value field is a dash and no real or simulated statistics are used.
This screen is a conceptual mock-up of the Hualien Civic Dashboard. It is not a live platform and contains no real-time data.
What this module publishes
- 案件分類:道路、排水、路燈、交通。
- 公開完成率、逾期率、平均天數。
- 熱點地圖不顯示陳情人個資。
- 重複發生的問題,列入改善清單。
預算公開
每一筆錢,都有去向
Concept screen
Budget against execution (relative share)
- Budget
- Execution
- Education
- Infrastructure
- Social welfare
- Transport
- Environment
Year-on-year comparison
Major policies linked to outcomes
- Beneficiaries
- Outcome indicators
- Responsible unit
Lagging items
- Reason for delay
- Recovery schedule
- Follow-up
Lagging items publish the reason, a recovery schedule and the responsible unit.
Budget and final-account data is available for download, each dataset labelled with its source and update date.
數值說明:This mock-up shows layout structure only. Every value field is a dash and no real or simulated statistics are used.
This screen is a conceptual mock-up of the Hualien Civic Dashboard. It is not a live platform and contains no real-time data.
What this module publishes
- 預算、決算、執行率並列。
- 重大政策連結受益人數與成果。
- 年度比較,可下載原始資料。
- 落後項目公開原因與改善期程。
重大工程
公開進度,也公開變更理由
Concept screen
Project locations
- Under construction
- In acceptance
- Completed
Duration and phases (relative share)
- Planning
- Construction
- Acceptance
- Road improvement
- Drainage improvement
- Pedestrian environment
- New public parking
Project details
- Responsible unit
- Contractor
- Acceptance status
- Total cost
- Duration
- Supervision record
Change log (supplementary budget and extensions)
- Supplementary budget reason
- Extension reason
- Approval date
Every change records its reason, approval date and approval level. On completion the project history and result photos are published.
數值說明:This mock-up shows layout structure only. Every value field is a dash and no real or simulated statistics are used.
This screen is a conceptual mock-up of the Hualien Civic Dashboard. It is not a live platform and contains no real-time data.
What this module publishes
- 地圖顯示位置、工期與總經費。
- 公開承辦單位、廠商與驗收狀態。
- 追加預算與展延原因留下紀錄。
- 完工後公開成果照片與履歷。
交通停車
新增車位在哪裡,一查就知道
Concept screen
Parking and junction layers
- Public parking lot
- On-street parking
- Accessible spaces
- Dangerous junction
- School-route fix
Every new parking space published point by point
| New space | Location | Completion date |
|---|---|---|
| Example point one | ||
| Example point two | ||
| Example point three | ||
| Example point four |
Each new space publishes its location and completion date, with usage updated after completion.
Dangerous junctions and school routes
- Junction improvements
- School-route footpath improvements
- Pedestrian environment improvements
Accessible and family spaces
- Parent-and-child bays
- Accessible bays
- EV charging bays
- Priority bays
Live parking guidance
Parking data must be accurate and complete first; live guidance is connected step by step so that empty-space information is never wrong.
數值說明:This mock-up shows layout structure only. Every value field is a dash and no real or simulated statistics are used.
This screen is a conceptual mock-up of the Hualien Civic Dashboard. It is not a live platform and contains no real-time data.
What this module publishes
- 停車場、路邊停車與友善空間整合。
- 新增車位逐點公開位置與完工日。
- 同步呈現危險路口與通學改善。
- 資訊逐步串接即時停車導引。
海洋環境
海廢熱點與改善成果一起公開
Concept screen
Marine debris hotspot density (relative)
- Low
- Medium
- High
Coastal pollution reports and the debris hotspot map are published together, and every report and clean-up leaves a record.
Long-term monitoring (relative change)
- Debris density
- Clean-up coverage
- Repeat pollution
Long-term change is compared against one baseline, so improvement is tested with long-term data rather than a single clean-up event.
Citizen science partners
- Schools
- Communities
- Environmental groups
- Citizen science volunteers
數值說明:This mock-up shows layout structure only. Every value field is a dash and no real or simulated statistics are used.
This screen is a conceptual mock-up of the Hualien Civic Dashboard. It is not a live platform and contains no real-time data.
What this module publishes
- 海岸污染通報與海廢熱點地圖。
- 公開清除量與重複污染情形。
- 串聯學校、社區與公民科學。
- 用長期資料檢驗環境改善。
會議紀錄
重要決策不只留下新聞稿
Concept screen
Meeting records
| Meeting | Resolutions | Responsible unit | Deadline |
|---|---|---|---|
| Municipal affairs meeting | |||
| Tracked-items meeting | |||
| Construction coordination | |||
| Policy coordination |
Personal and sensitive data is redacted as required by law. What is published is the agenda, the resolutions, the responsible unit and the deadline — not a press release.
Tracked items
- Tracked policy itemsTracked
- Tracked project itemsTracked
- Carried-over itemsClosed
Personal and sensitive data
- Redaction
- Publication deadline
- Publication format
Important records are published within fourteen days in principle; procurement and sensitive data remain restricted by law.
數值說明:This mock-up shows layout structure only. Every value field is a dash and no real or simulated statistics are used.
This screen is a conceptual mock-up of the Hualien Civic Dashboard. It is not a live platform and contains no real-time data.
What this module publishes
- 公開議程、決議、主責單位與期限。
- 重大政策與工程列管事項可追蹤。
- 依法遮蔽個資及敏感資料。
- 原則會後 14 日內公開重要紀錄。
參與式預算
市民的提案走完一整年的循環,從提出需求到公開驗收。
Concept screen
Participatory budgeting cycle
- Proposal
- Review
- Discussion
- Vote
- Delivery
- Acceptance
Citizens raise a need, cost and responsibility are published, proposals are revised for feasibility, citizens express a choice, the project enters the annual budget, and results and progress are published.
What is published for each proposal
- Cost
- Responsibility
- Feasibility
- Links to budget and project progress
Citizen choices (relative share)
- Proposal one
- Proposal two
- Proposal three
Selected proposals are linked to budget and project progress, so the vote has a visible follow-up.
The pilot allocation is only settled after a fiscal assessment; no specific amount is announced before that.
數值說明:This mock-up shows layout structure only. Every value field is a dash and no real or simulated statistics are used.
This screen is a conceptual mock-up of the Hualien Civic Dashboard. It is not a live platform and contains no real-time data.
What this module publishes
- 提案 → 審查 → 討論 → 投票 → 執行 → 驗收。
- 公布各案成本、權責與可行性;獲選提案連結預算及工程進度。
- 試辦額度須經財政評估後定案,網站不先行公布具體金額。
This is a campaign website. All policy content describes the candidate’s proposals and plans; it is not a current service or live information of the Hualien City Office. Any proposal involving funding, statutory authority or inter-agency cooperation must proceed through budget procedures and applicable regulations.
Civic participation must exclude no one. Beyond online channels, this office maintains phone, paper and in-person channels, and the website is built to accessibility standards.